Construction steps |
1.Remove the oil and dust from the substrate. |
2. According to the construction plan formulated by the technical department, perform rust prevention, rust removal or anti-corrosion treatment; if the materials of the tank and pipeline are different and there is rust, a rust-proof layer should be applied. |
3. According to the requirements of the construction plan, use spraying equipment to spray or brush, scrape, and apply thick coating types of paints on the tank and pipelines to achieve the desired thickness and overall aesthetic appearance. |
4. Test the thickness and temperature, and make necessary supplements. |