Industrial Factory Application Cases

Product Name Construction tools   Construction method 
Aerogel thermal insulation coating for industrial use, type II  Airless spray compressor Spraying

 

 Construction steps
1.Remove the oil and dust from the substrate. 
2. According to the construction plan formulated by the technical department, perform rust prevention, rust removal or anti-corrosion treatment; if the materials of the tank and pipeline are different and there is rust, a rust-proof layer should be applied. 
3. According to the construction plan requirements, apply 1MM coating by spraying to achieve the desired thickness and overall appearance. 
4. After the renovation, the indoor temperature during summer is 4-7℃ lower than the ambient temperature, and the perceived temperature drops by 8-10℃.