Construction steps
|
1.First, clean the surface of the greenhouse film. |
2. Let the film surface dry for 1 to 2 hours. |
3. For the first application, use an airless spraying equipment to apply a coating of 0.5 - 1mm thickness. |
4. After a 2-3 hour interval, when the surface of the coating is dry, apply the second coat using an airless spraying equipment, spraying a coating thickness of 0.5-1mm. |
5. After the coating dries completely, conduct continuous tests for 72 hours. The actual data shows that the temperature inside the greenhouse during summer, when unaltered, was 8-13℃ lower than before the renovation, and 6-8℃ lower than the ambient |